Full Text
Farmington MPO Rec Num: 4 CN: F100090 Lead Agency: City of Aztec Est. Letting: Proj East Arterial Phase 1B Fr: US 550 To: Legion Rd Project Desc.: Construct new road Est. Proj. Cost: $3,500,000 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: City of Aztec RT1 Length: 0 Category: Capacity Proj Remarks: Added to FFY2014-2019 TIP through Amendment #5 (PC approval on 3-20-14), TIP Modification #5 moves the funding from FFY 2015 to 2014. PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100090 Construction â– Right-of-way â–¡ Prel. Engr. â–¡ FUND SOURCE 2014 2015 2016 2017 2018 2019 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design â–¡ Environ. Document â–¡ Other â–¡ TIP Informational Years TIP Amendment Pending?â–¡ Reg. Sig. Work Zone: RT2 Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 BMP: 0 STP-Sm Urb $2,990,400 $2,990,400 $3,500,000 $3,500,000 Totals $509,600 $509,600 State Match $0 $0 Local Match 01 Thursday, May 22, 2014 ---PAGE BREAK--- Farmington MPO Rec Num: 3 CN: F100091 Lead Agency: City of Aztec Est. Letting: Proj Legion Rd Fr: Current end of Legion Rd To: East Arterial Project Desc.: Construct new road (logical termini) in preparation for future East Arterial route Est. Proj. Cost: $510,000 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: City of Aztec RT1 Length: 0 Category: Capacity Proj Remarks: Added to the FFY2014-2019 TIP through Amendment #4 (approved January 16,2014) PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100091 Construction â– Right-of-way â–¡ Prel. Engr. â–¡ FUND SOURCE 2014 2015 2016 2017 2018 2019 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design â– Environ. Document â–¡ Other â–¡ TIP Informational Years TIP Amendment Pending?â–¡ Routine Work Zone: RT2 Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 BMP: 0 $510,000 $510,000 Totals $450,000 $450,000 Local Other $60,000 $60,000 Local Other 01 15 Thursday, May 22, 2014 ---PAGE BREAK--- Farmington MPO Rec Num: 42 CN: F100100 Lead Agency: City of Farmington Est. Letting: Proj E Pinon Hills Blvd Fr: NM 516 Main) To: Hubbard Project Desc.: Full rebuild of the Intersection of Pinon Hills and NM 516; Extention of Pinon Hills Blvd to include earthwork, asphalt, street lighting, drainage improvements and signalization upgrades Est. Proj. Cost: $3,000,000 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: City of Farmington RT1 Length: 0 Category: Capacity Proj Remarks: Changed Control Number as part of Amendment #1 to FFY 2014-2019 TIP (Approved June 20th 2013). TIP Modification #6 moved $600,000 from STP-Sm Urb to ROW (TCSP) in FY 2015. PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100100 Construction â– Right-of-way â– Prel. Engr. â–¡ FUND SOURCE 2014 2015 2016 2017 2018 2019 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design â–¡ Environ. Document â–¡ Other â–¡ TIP Informational Years TIP Amendment Pending?â–¡ Reg. Sig. Work Zone: RT2 Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 BMP: 0 STP-Sm Urb $2,511,936 $2,511,936 TCSP $48,000 $48,000 $3,000,000 $3,000,000 Totals $428,064 $428,064 State Match $12,000 $12,000 Local Match 01 16 Thursday, May 22, 2014 ---PAGE BREAK--- Farmington MPO Rec Num: 101.1 CN: F100110 Lead Agency: NMDOT D-5 Est. Letting: Proj US 64 Phase IV Fr: MP 58 To: MP 60 Project Desc.: Widen to 6 lanes Est. Proj. Cost: $16,500,000 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: Unincorporated San Juan Co RT1 US0064 Length: 2 Category: Capacity Proj Remarks: Amended in the FFY 2014-2019 TIP through Amendment #2 (approved on Sep 19,2013). Split ROW and Construction funding as part of Modification #4 (Feb 10, 2014). PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100110 Construction â– Right-of-way â– Prel. Engr. â–¡ FUND SOURCE 2014 2015 2016 2017 2018 2019 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design â–¡ Environ. Document â–¡ Other â–¡ TIP Informational Years TIP Amendment Pending?â–¡ Reg. Sig. Work Zone: RT2 Rt 1 BMP 58 Rt 2 BMP: 0 Rt 1 EMP: 60 Rt 2 BMP: 0 NHPP $3,071,364 $8,544,000 $11,615,364 NHPP $213,600 $213,600 STP-Sm Urb $2,268,636 $2,268,636 $16,500,000 $250,000 $3,594,761 $12,655,238 Totals $2,402,400 $36,400 $523,397 $1,842,602 State Match $0 $0 $0 $0 Local Match 03 03 16 03 Thursday, May 22, 2014 ---PAGE BREAK--- Farmington MPO Rec Num: 101.2 CN: F100112 Lead Agency: NMDOT D-5 Est. Letting: Proj US 64 Phase V Fr: MP 56 To: MP 58 Project Desc.: Widen to 6 Lanes Est. Proj. Cost: $17,655,750 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: Unincorporated San Juan Co RT1 US0064 Length: 2 Category: Capacity Proj Remarks: Added this phase of the US 64 widening project to the Regionally Significant List from the Unfunded List as part of Amendment #2 to the FFY 2014-2019 TIP (approved Sept 19, 2013). PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100112 Construction â– Right-of-way â–¡ Prel. Engr. â– FUND SOURCE 2014 2015 2016 2017 2018 2019 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design â– Environ. Document â– Other â–¡ TIP Informational Years TIP Amendment Pending?â–¡ Reg. Sig. Work Zone: RT2 Rt 1 BMP 56 Rt 2 BMP: 0 Rt 1 EMP: 58 Rt 2 BMP: 0 NHPP $4,240,116 $10,071,084 $4,240,116 NHPP $773,873 $773,873 $5,868,433 $905,750 $4,962,682 $11,787,317 Totals $854,444 $131,877 $722,566 $1,716,233 State Match $0 $0 $0 $0 Local Match 03 03 15 Thursday, May 22, 2014 ---PAGE BREAK--- Farmington MPO Rec Num: 101.3 CN: F100113 Lead Agency: NMDOT D-5 Est. Letting: Proj US 64 Phase VI Fr: MP 54 To: MP 56 Project Desc.: Widen to 6 lanes Est. Proj. Cost: $9,000,000 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: Unincorporated San Juan Co RT1 US0064 Length: 2 Category: Capacity Proj Remarks: Added this phase of the US 64 widening project to the Regionally Significant List from the Unfunded List as part of Amendment #2 to the FFY 2014-2019 TIP (approved Sept 19, 2013). PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100113 Construction â– Right-of-way â–¡ Prel. Engr. â–¡ FUND SOURCE 2014 2015 2016 2017 2018 2019 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design â–¡ Environ. Document â–¡ Other â–¡ TIP Informational Years TIP Amendment Pending?â–¡ Reg. Sig. Work Zone: RT2 Rt 1 BMP 54 Rt 2 BMP: 0 Rt 1 EMP: 56 Rt 2 BMP: 0 NHPP $6,565,803 $0 STP-Sm Urb $1,123,797 $0 $0 $9,000,000 Totals $0 $1,310,400 State Match $0 $0 Local Match 03 03 Thursday, May 22, 2014 ---PAGE BREAK--- Farmington MPO Rec Num: 41.1 CN: F100130 Lead Agency: City of Farmington Est. Letting: Proj 20th Street Phase 1 Fr: Clayton To: Fairview Project Desc.: Pedestrian Facilities, including sidewalks Est. Proj. Cost: $249,000 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: City of Farmington RT1 Length: 0 Category: Bike/Ped Remarks: Changed and split an existing TPE project into two new phases using TAP funds as part of Amendment #3 to the FFY 2014-2019 TIP (approved Nov 14,2013). PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100130 Construction â– Right-of-way â–¡ Prel. Engr. â– FUND SOURCE 2014 2015 2016 2017 2018 2019 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design â– Environ. Document â– Other â–¡ TIP Informational Years TIP Amendment Pending?â–¡ Routine Work Zone: RT2 Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 BMP: 0 TAP-Sm Urb $159,741 $28,959 $188,700 $249,000 $215,106 $33,894 Totals $0 $0 $0 State Match $32,157 $27,222 $4,935 Local Match $28,143 $28,143 Local Non-Match 15 28 28 Thursday, May 22, 2014 ---PAGE BREAK--- Farmington MPO Rec Num: 41.2 CN: F100131 Lead Agency: City of Farmington Est. Letting: Proj 20th Street Phase 2 Fr: Fairview To: Sullivan Project Desc.: Pedestrian Facilities, including sidewalks Est. Proj. Cost: $225,000 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: City of Farmington RT1 Length: 0 Category: Bike/Ped Remarks: Changed an existing TPE project into two new phases using TAP funds as part of Amendment #3 to the FFY 2014-2019 TIP (approved Nov 14, 2013) PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100131 Construction â– Right-of-way â–¡ Prel. Engr. â– FUND SOURCE 2014 2015 2016 2017 2018 2019 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design â– Environ. Document â– Other â–¡ TIP Informational Years TIP Amendment Pending?â–¡ Routine Work Zone: RT2 Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 BMP: 0 TAP-Sm Urb $130,782 $130,782 $225,000 $225,000 Totals $0 $0 State Match $22,287 $22,287 Local Match $71,931 $71,931 Local Non-Match 15 28 Thursday, May 22, 2014 ---PAGE BREAK--- Farmington MPO Rec Num: 102 CN: F100170 Lead Agency: NMDOT D-5 Est. Letting: Proj NM 173 Fr: MP 2 To: MP 3.5 Project Desc.: Safety Improvements Est. Proj. Cost: $2,000,000 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: Unincorporated San Juan Co RT1 NM0173 Length: 1.5 Category: Safety Remarks: Revised funding, work description and fiscal years as part of Modifcation #2 (Oct 23, 2013) PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100170 Construction â– Right-of-way â– Prel. Engr. â–¡ FUND SOURCE 2014 2015 2016 2017 2018 2019 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design â– Environ. Document â–¡ Other â–¡ TIP Informational Years TIP Amendment Pending?â–¡ Routine Work Zone: RT2 Rt 1 BMP 2 Rt 2 BMP: 0 Rt 1 EMP: 3.5 Rt 2 BMP: 0 Safety (HSIP) $926,400 $926,400 Safety (HSIP) $926,400 $926,400 $2,000,000 $1,000,000 $1,000,000 Totals $147,200 $73,600 $73,600 State Match $0 $0 $0 Local Match 15 21 Thursday, May 22, 2014 ---PAGE BREAK--- Farmington MPO Rec Num: 43 CN: F100200 Lead Agency: City of Farmington Est. Letting: Proj San Juan Blvd/Scott Ave Intersection Fr: N/A To: N/A Project Desc.: Traffic signal reconstruction Est. Proj. Cost: $375,000 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: City of Farmington RT1 Length: 0 Category: Safety Remarks: Added this safety project to the Regionally Significant List from the Unfunded List as part of Amendment # 1 to FFY 2014-2019 TIP (Approved June 20th 2013. Split funding: $20,000 for PE and $355,000 for Construction as part of Modification #4 (Feb 10, 2014) PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100200 Construction â– Right-of-way â–¡ Prel. Engr. â– FUND SOURCE 2014 2015 2016 2017 2018 2019 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design â–¡ Environ. Document â–¡ Other â–¡ TIP Informational Years TIP Amendment Pending?â–¡ Routine Work Zone: RT2 Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 BMP: 0 Safety (HSIP) $18,528 $18,528 Safety (HSIP) $328,872 $328,872 $375,000 $20,000 $355,000 Totals $27,600 $1,472 $26,128 State Match $0 $0 $0 Local Match 15 21 Thursday, May 22, 2014 ---PAGE BREAK--- Farmington MPO Rec Num: 81 CN: F100210 Lead Agency: County of San Juan Est. Letting: Proj CR 350/ CR 390 Intersection Fr: N/A To: N/A Project Desc.: Preliminary Engineering, ROW acquisition, and construct improvements Est. Proj. Cost: $650,000 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: Unincorporated San Juan Co RT1 Length: 0 Category: Safety Remarks: Revised work description, funding, and fiscal years as part of Modification #3 (Dec 5, 2013) PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100210 Construction â– Right-of-way â– Prel. Engr. â– FUND SOURCE 2014 2015 2016 2017 2018 2019 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design â– Environ. Document â– Other â–¡ TIP Informational Years TIP Amendment Pending?â–¡ Routine Work Zone: RT2 Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 BMP: 0 Safety (HSIP) $106,536 $106,536 Safety (HSIP) $32,424 $32,424 Safety (HSIP) $463,200 $463,200 $650,000 $115,000 $35,000 $500,000 Totals $47,840 $8,464 $2,576 $36,800 State Match $0 $0 $0 $0 Local Match 15 16 21 Thursday, May 22, 2014 ---PAGE BREAK--- Farmington MPO Rec Num: 44 CN: F100220 Lead Agency: City of Farmington Est. Letting: Proj Southside River Road River Trail Fr: Pinon Hills Blvd Ext To: 0.6 Miles west Project Desc.: Construct River Trail Est. Proj. Cost: $93,586 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: City of Farmington RT1 Length: 0 Category: Bike/Ped Remarks: Added this TAP project as part of Amendment #3 to the FFY 2014-2019 TIP (approved Nov 14, 2014) PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100220 Construction â– Right-of-way â–¡ Prel. Engr. â– FUND SOURCE 2014 2015 2016 2017 2018 2019 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design â– Environ. Document â– Other â–¡ TIP Informational Years TIP Amendment Pending?â–¡ Routine Work Zone: RT2 Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 BMP: 0 TAP-Rural $23,293 $23,293 $46,586 $93,587 $66,324 $27,262 Totals $0 $0 $0 State Match $7,939 $3,969 $3,969 Local Match $39,062 $39,062 Local Non-Match 15 28 28 Thursday, May 22, 2014 ---PAGE BREAK--- Farmington MPO Rec Num: 21.1 CN: F100230 Lead Agency: City of Bloomfield Est. Letting: Proj Vereda del Rio San Juan River Trail Phase II Fr: Existing Trail To: .324 Miles East Project Desc.: Construct river trail Est. Proj. Cost: $199,636 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: City of Bloomfield RT1 Length: 0 Category: Bike/Ped Remarks: ROW, Envt, Design previously completed under CN 0002(091). Added and split this project (Phase II & III) via TAP funds as part of Amendment #3 to the FFY 2014-2019 TIP (approved Nov 14,2013) PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100230 Construction â– Right-of-way â–¡ Prel. Engr. â–¡ FUND SOURCE 2014 2015 2016 2017 2018 2019 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design â–¡ Environ. Document â–¡ Other â–¡ TIP Informational Years TIP Amendment Pending?â–¡ Routine Work Zone: RT2 Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 BMP: 0 TAP-Sm Urb $158,580 $158,580 $199,636 $199,636 Totals $0 $0 State Match $27,024 $27,024 Local Match $14,032 $14,032 Local Non-Match 28 28 Thursday, May 22, 2014 ---PAGE BREAK--- Farmington MPO Rec Num: 21.2 CN: F100231 Lead Agency: City of Bloomfield Est. Letting: Proj Vereda del Rio San Juan River Trail Phase III Fr: End of Phase II To: .495 Miles East Project Desc.: Construct River Trail Est. Proj. Cost: $203,050 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: City of Bloomfield RT1 Length: 0 Category: Bike/Ped Remarks: Added and split this project (Phase II & III) via TAP funds as part of Amendment #3 to the FFY 2014-2019 TIP (approved Nov 14,2013). PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100231 Construction â– Right-of-way â–¡ Prel. Engr. â–¡ FUND SOURCE 2014 2015 2016 2017 2018 2019 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design â–¡ Environ. Document â–¡ Other â–¡ TIP Informational Years TIP Amendment Pending?â–¡ Routine Work Zone: RT2 Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 BMP: 0 TAP-Sm Urb $158,580 $158,580 $203,050 $203,050 Totals $0 $0 State Match $27,024 $27,024 Local Match $17,446 $17,446 Local Non-Match 28 28 Thursday, May 22, 2014 ---PAGE BREAK--- Farmington MPO Rec Num: 2 CN: F100240 Lead Agency: City of Aztec Est. Letting: Proj Animas River Trail Fr: Hampton Arroyo To: 320' north of US 550/NM 516 intersection Project Desc.: Construction of a pedestrian trail and transit stop providing connectivity to Aztec Ruins National Monument Est. Proj. Cost: $547,805 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: City of Aztec RT1 Length: 0 Category: Bike/Ped Remarks: Orignially added to FFY2014-2019 TIP through Amendment #3 on Nov 14, 2013 PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100240 Construction â– Right-of-way â–¡ Prel. Engr. â– FUND SOURCE 2014 2015 2016 2017 2018 2019 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design â– Environ. Document â– Other â–¡ TIP Informational Years TIP Amendment Pending?â–¡ Routine Work Zone: RT2 Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 BMP: 0 FTA Transit in the Parks $319,900 $319,900 $547,805 $547,805 Totals $0 $0 State Match $0 $0 Local Match $227,905 $227,905 Local Non-Match 15 28 Thursday, May 22, 2014 ---PAGE BREAK--- Farmington MPO Rec Num: 1 CN: F100250 Lead Agency: City of Aztec Est. Letting: Proj Animas River Trail Fr: Aztec Ruins To: Martinez Lane Project Desc.: Construct bicycle/pedestrian trail from Aztec Ruins (Ruins Rd) to pedestrian bridge to Martinez Lane Est. Proj. Cost: $350,000 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: City of Aztec RT1 Length: 0 Category: Bike/Ped Remarks: Orignially added to FFY2014-2019 TIP through Amendment #2 for $806,911 on Sept 19, 2013. Modification #4 to the FFY 2014-2019 TIP (Feb 10, 2014) reduced funding to $350,000. PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100250 Construction â– Right-of-way â–¡ Prel. Engr. â–¡ FUND SOURCE 2014 2015 2016 2017 2018 2019 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design â–¡ Environ. Document â–¡ Other â–¡ TIP Informational Years TIP Amendment Pending?â–¡ Routine Work Zone: RT2 Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 BMP: 0 $350,000 $350,000 Totals $350,000 $350,000 Local Other 28 Thursday, May 22, 2014 ---PAGE BREAK--- Farmington MPO Rec Num: 201 CN: TF00001 Lead Agency: City of Farmington Est. Letting: Proj Red Apple Transit Capital/Operating Fr: N/A To: N/A Project Desc.: Annual operating costs and purchase of one cutaway bus Est. Proj. Cost: $1,289,587 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: City of Farmington RT1 Length: 0 Category: Transit Remarks: PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: TF000001 Construction â–¡ Right-of-way â–¡ Prel. Engr. â–¡ FUND SOURCE 2014 2015 2016 2017 2018 2019 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design â–¡ Environ. Document â–¡ Other â– TIP Informational Years TIP Amendment Pending?â–¡ Exempt Work Zone: RT2 Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 BMP: 0 FTA 5307 (Sm Urb Cap) $63,500 $63,500 FTA 5307 (Sm Urb Oper) $605,106 $605,106 $1,289,587 $1,289,587 Totals $0 $0 State Match $620,981 $620,981 Local Match 23 23 Thursday, May 22, 2014