← Back to Farmingtonnm Gov

Document farmingtonnm_gov_doc_08260fe4b0

Full Text

Farmington Metropolitan Planning Organization Federal Fiscal Year 2016-2021 Transportation Improvement Program (TIP) ---PAGE BREAK--- Farmington MPO Rec Num: 3 CN: F100091 Lead Agency: City of Aztec Est. Letting: Proj East Arterial Route Phase II Fr: Current end of Legion Rd To: NM 173 Project Desc.: Construct remaining road section from end of Phase I to NM 173 including a detached multi-use pedestrian path. Utility work consisting of a 10- inch water line will be constructed for the entire length of the project. Est. Proj. Cost: $7,319,750 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: City of Aztec RT1 Length: 0 Category: Capacity Proj Remarks: Legion Rd added to the FFY2014-2019 TIP through Amendment #4 (approved January 16,2014), Removed Legion Rd from TIP per amendment #6 to FFY 2014-2019 TIP on 8.21.14 substituted Phase II of East Arterial Route. 2.13.15 reworded scope of work to include pedestrian path and utility work (10" water line). Mod #16 Moved $1M from StateSevTax funds PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100091 Construction â–  Right-of-way â–¡ Prel. Engr. â–¡ FUND SOURCE 2016 2017 2018 2019 2020 2021 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design â–¡ Environ. Document â–¡ Other â–¡ TIP Informational Years TIP Amendment Pending?â–¡ Routine Work Zone: RT2 Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 BMP: 0 STP-Sm Urb $2,990,400 $2,990,400 $7,319,750 $2,819,750 $4,500,000 Totals $0 $0 State Match $509,600 $509,600 Local Match $2,819,750 $2,819,750 Severance Tax $1,000,000 $1,000,000 Local Non-Match 01 15 17 Farmington MPOs FFY2016-2021 Transportation Improvement Program (Approved June 30, 2015) 1 of 15 ---PAGE BREAK--- Farmington MPO Rec Num: 42 CN: F100100 Lead Agency: City of Farmington Est. Letting: Proj East Pinon Hills Boulevard Extension Phase I Fr: NM 516 (E.Main) To: Hubbard Project Desc.: Includes earthwork, asphalt, street lighting, drainage improvements and signalization upgrades. Est. Proj. Cost: $3,950,000 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: City of Farmington RT1 FL4356 Length: 0 Category: Capacity Proj Remarks: Amendment #9 (Dec 1, 2014) includes describing Phase II ($14,250,000 - Hubbard to CR 3000 & Phase III ($8,250,000 - CR 3000 to CR 390) to this project as future phases outside of 2014-2019 TIP cycle. This amendment #9 also adds $250,000 for FY2019 for Final Design & PS&E Certifications. Deleted $250,000 CMAQ Flex from FFY2019 moved to a new PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100100 Construction â–  Right-of-way â–  Prel. Engr. â–  FUND SOURCE 2016 2017 2018 2019 2020 2021 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design â–  Environ. Document â–¡ Other â–¡ TIP Informational Years TIP Amendment Pending?â–¡ Reg. Sig. Work Zone: RT2 Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 BMP: 0 STP-Sm Urb $2,853,696 $2,853,696 TCSP $48,000 $48,000 $3,700,000 $3,700,000 Totals $486,304 $486,304 State Match $12,000 $12,000 Local Match $300,000 $300,000 Local Non-Match 01 01 16 Farmington MPOs FFY2016-2021 Transportation Improvement Program (Approved June 30, 2015) 2 of 15 ---PAGE BREAK--- Farmington MPO Rec Num: 42.1 CN: F100101 Lead Agency: City of Farmington Est. Letting: Proj East Pinon Hills Blvd Extension Phase II Fr: Hubbard To: CR 3000 Project Desc.: Includes earthwork, asphalt, intersection lighting, bridges over the Animas River and oxbow, drainage improvements, environmental mitigation. Est. Proj. Cost: $13,265,454 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: City of Farmington RT1 Length: 0 Category: Capacity Proj Remarks: Added Phase II to the TIP with $250,000 to CMAQ Flex in FFY 2017, added new scope for Phase II 2.13.15. PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100101 Construction â–  Right-of-way â–¡ Prel. Engr. â–  FUND SOURCE 2016 2017 2018 2019 2020 2021 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design â–  Environ. Document â–  Other â–¡ TIP Informational Years TIP Amendment Pending?â–¡ Reg. Sig. Work Zone: RT2 Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 BMP: 0 CMAQ-Flex $213,600 $213,600 $250,000 $250,000 Totals $0 $0 State Match $36,400 $36,400 Local Match 15 Farmington MPOs FFY2016-2021 Transportation Improvement Program (Approved June 30, 2015) 3 of 15 ---PAGE BREAK--- Farmington MPO Rec Num: 83 CN: F100102 Lead Agency: San Juan County Est. Letting: Proj New Project East Pinon Hills Blvd Extension Phase III Fr: New South Side River Road (CR 3000) To: New Project Wildflower Parkway (CR 390) Project Desc.: New Project Includes earthwork, asphalt, intersection lighting, drainage improvements, environmental mitigation Est. Proj. Cost: $8,000,000 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: Unincorporated San Juan Co RT1 Length: 2.2 Category: Roadway Remarks: New projected add to the FFY 16-21 TIP in June 2015. PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100102 Construction â–  Right-of-way â–¡ Prel. Engr. â–  FUND SOURCE 2016 2017 2018 2019 2020 2021 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design â–  Environ. Document â–¡ Other â–¡ TIP Informational Years TIP Amendment Pending?â–  Signif. Work Zone: RT2 Rt 1 BMP Rt 2 BMP: Rt 1 EMP: Rt 2 BMP: $8,000,000 Totals $8,000,000 Local Non-Match 01 $8,000,000 $8,000,000 Farmington MPOs FFY2016-2021 Transportation Improvement Program (Approved June 30, 2015) 4 of 15 ---PAGE BREAK--- Farmington MPO Rec Num: 101.1 CN: F100110 Lead Agency: NMDOT D-5 Est. Letting: Proj US 64 Phase IV Fr: MP 57.8 To: MP 60.2 Project Desc.: Widen to 6 lanes Est. Proj. Cost: $15,600,000 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: Unincorporated San Juan Co RT1 US0064 Length: 2.4 Category: Capacity Proj Remarks: Amended in the FFY 2014-2019 TIP through Amendment #2 (approved on Sep 19,2013). Split ROW and Construction funding as part of Modification #4 (Feb 10, 2014). Decreases NHPP by $4,440,034 in FY 2016 and STP by $2,655,239 also in FY 2016 as part of Amendment #7 to FFY2014-20190 TIP 9.18.14. TIP Modification 11 moves $3,018,546 from PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100110 Construction â–  Right-of-way â–  Prel. Engr. â–¡ FUND SOURCE 2016 2017 2018 2019 2020 2021 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design â–¡ Environ. Document â–¡ Other â–¡ TIP Informational Years TIP Amendment Pending?â–¡ Reg. Sig. Work Zone: RT2 Rt 1 BMP 57.8 Rt 2 BMP: 0 Rt 1 EMP: 60.2 Rt 2 BMP: 0 NHPP $2,171,389 $2,171,389 $2,541,420 $2,541,420 Totals $370,031 $370,031 State Match $0 $0 Local Match 03 Farmington MPOs FFY2016-2021 Transportation Improvement Program (Approved June 30, 2015) 5 of 15 ---PAGE BREAK--- Farmington MPO Rec Num: 101.2 CN: F100112 Lead Agency: NMDOT D-5 Est. Letting: Proj US 64 Phase V Fr: MP 56 To: MP 58 Project Desc.: CP-91 Widen to 6 Lanes Est. Proj. Cost: $17,655,750 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: Unincorporated San Juan Co RT1 US0064 Length: 2 Category: Capacity Proj Remarks: Added this phase of the US 64 widening project to the Regionally Significant List from the Unfunded List as part of Amendment #2 to the FFY 2014-2019 TIP (approved Sept 19, 2013). Brings total FY 2015 total to $974,000 and changes from NHPP to STPF per amendment #7 to FFY2014-2019 TIP. TIP Modification #14, added CP-91 language to Scope of PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100112 Construction â–  Right-of-way â–¡ Prel. Engr. â–  FUND SOURCE 2016 2017 2018 2019 2020 2021 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design â–  Environ. Document â–  Other â–¡ TIP Informational Years TIP Amendment Pending?â–¡ Reg. Sig. Work Zone: RT2 Rt 1 BMP 56 Rt 2 BMP: 0 Rt 1 EMP: 58 Rt 2 BMP: 0 NHPP $4,240,116 $7,059,080 $11,299,196 $13,224,714 $4,962,682 $8,262,032 Totals $1,925,518 $722,566 $1,202,952 State Match $0 $0 $0 Local Match 03 03 Farmington MPOs FFY2016-2021 Transportation Improvement Program (Approved June 30, 2015) 6 of 15 ---PAGE BREAK--- Farmington MPO Rec Num: 101.3 CN: F100113 Lead Agency: NMDOT D-5 Est. Letting: Proj US 64 Phase VI Fr: MP 54 To: MP 56 Project Desc.: Widen to 6 lanes Est. Proj. Cost: $9,000,000 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: Unincorporated San Juan Co RT1 US0064 Length: 2 Category: Capacity Proj Remarks: Added this phase of the US 64 widening project to the Regionally Significant List from the Unfunded List as part of Amendment #2 to the FFY 2014-2019 TIP (approved Sept 19, 2013). PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100113 Construction â–  Right-of-way â–¡ Prel. Engr. â–¡ FUND SOURCE 2016 2017 2018 2019 2020 2021 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design â–¡ Environ. Document â–¡ Other â–¡ TIP Informational Years TIP Amendment Pending?â–¡ Reg. Sig. Work Zone: RT2 Rt 1 BMP 54 Rt 2 BMP: 0 Rt 1 EMP: 56 Rt 2 BMP: 0 NHPP $6,565,803 $6,565,803 STP-Sm Urb $1,123,797 $1,123,797 $9,000,000 $9,000,000 Totals $1,310,400 $1,310,400 State Match $0 $0 Local Match 03 03 Farmington MPOs FFY2016-2021 Transportation Improvement Program (Approved June 30, 2015) 7 of 15 ---PAGE BREAK--- Farmington MPO Rec Num: 104 CN: F100114 Lead Agency: NMDOT D-5 Est. Letting: Proj Bridge Preservation: US 550 #9178 & #9179 Fr: 169.5 To: 169.5 Project Desc.: Bridge Maintenance and Preservation, resurface bridge. Est. Proj. Cost: $260,000 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: Unincorporated San Juan Co RT1 US0550 Length: 0 Category: Maintenance Remarks: Added to TIP as part of amendment #7 (FFY2014-2019) $260,000 NHPP funding for FY2017. PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100114 Construction â–  Right-of-way â–¡ Prel. Engr. â–¡ FUND SOURCE 2016 2017 2018 2019 2020 2021 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design â–¡ Environ. Document â–¡ Other â–¡ TIP Informational Years TIP Amendment Pending?â–¡ Reg. Sig. Work Zone: RT2 Rt 1 BMP 169.5 Rt 2 BMP: 0 Rt 1 EMP: 169.5 Rt 2 BMP: 0 NHPP $222,144 $222,144 $260,000 $260,000 Totals $37,856 $37,856 State Match $0 $0 Local Match 05 Farmington MPOs FFY2016-2021 Transportation Improvement Program (Approved June 30, 2015) 8 of 15 ---PAGE BREAK--- Farmington MPO Rec Num: 102 CN: F100170 Lead Agency: NMDOT D-5 Est. Letting: Proj NM 173 Fr: MP 2.0 To: NM 575 Project Desc.: Safety Improvements Est. Proj. Cost: $2,000,000 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: Unincorporated San Juan Co RT1 NM0173 Length: 1.5 Category: Safety Remarks: Modification #10 moved FY2015 HSIP Safety Funds to FY2016 in the amount of $1M.Amendment #8 (Oct 8 2014) adds an additional $110,000 to FY2015 in STPF funds. (Dec 1, 2014) TIP Amendment #9 amends the termini description from MP 2.0 to NM 575. PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100170 Construction â–  Right-of-way â–  Prel. Engr. â–  FUND SOURCE 2016 2017 2018 2019 2020 2021 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design â–  Environ. Document â–¡ Other â–¡ TIP Informational Years TIP Amendment Pending?â–¡ Routine Work Zone: RT2 Rt 1 BMP 2 Rt 2 BMP: 0 Rt 1 EMP: 3.5 Rt 2 BMP: 0 Safety (HSIP) $926,400 $926,400 $1,000,000 $1,000,000 Totals $73,600 $73,600 State Match $0 $0 Local Match 21 Farmington MPOs FFY2016-2021 Transportation Improvement Program (Approved June 30, 2015) 9 of 15 ---PAGE BREAK--- Farmington MPO Rec Num: 81 CN: F100210 Lead Agency: County of San Juan Est. Letting: Proj CR 350/ CR 390 Intersection Fr: 500' South of intersection on CR 350 To: 500' North of Intersection on CR 350 Project Desc.: Preliminary Engineering, ROW acquisition, and construct improvements CR 350/CR390 intersection- 500ft North and South of intersection on CR 350, 500ft west of intersection on CR 390. Est. Proj. Cost: $650,000 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: Unincorporated San Juan Co RT1 453500 Length: 0.19 Category: Safety Remarks: Revised work description, funding, and fiscal years as part of Modification #3 (Dec 5, 2013). 12.02.14 updated project termini description as part of TIP modification #12 FFY2014-19. Modification #14 moves $35K FY2015 ROW funds to FY2016 to Safety Funds. PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100210 Construction â–  Right-of-way â–  Prel. Engr. â–  FUND SOURCE 2016 2017 2018 2019 2020 2021 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design â–  Environ. Document â–  Other â–¡ TIP Informational Years TIP Amendment Pending?â–¡ Routine Work Zone: RT2 Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 BMP: 0 Safety (HSIP) $495,624 $495,624 $535,000 $535,000 Totals $39,376 $39,376 State Match $0 $0 Local Match 21 Farmington MPOs FFY2016-2021 Transportation Improvement Program (Approved June 30, 2015) 10 of 15 ---PAGE BREAK--- Farmington MPO Rec Num: 21.1 CN: F100230 Lead Agency: City of Bloomfield Est. Letting: Proj Vereda del Rio San Juan River Trail Phase II Fr: Existing Trail To: .324 Miles East Project Desc.: Construct river trail Est. Proj. Cost: $199,636 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: City of Bloomfield RT1 Length: 0 Category: Bike/Ped Remarks: ROW, Envt, Design previously completed under CN 0002(091). Added and split this project (Phase II & III) via TAP funds as part of Amendment #3 to the FFY 2014-2019 TIP (approved Nov 14,2013). PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100230 Construction â–  Right-of-way â–¡ Prel. Engr. â–¡ FUND SOURCE 2016 2017 2018 2019 2020 2021 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design â–¡ Environ. Document â–¡ Other â–¡ TIP Informational Years TIP Amendment Pending?â–¡ Routine Work Zone: RT2 Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 BMP: 0 TAP-Sm Urb $119,012 $119,012 $153,325 $153,325 Totals $0 $0 State Match $20,281 $20,281 Local Match $14,032 $14,032 Local Non-Match 28 28 Farmington MPOs FFY2016-2021 Transportation Improvement Program (Approved June 30, 2015) 11 of 15 ---PAGE BREAK--- Farmington MPO Rec Num: 21.2 CN: F100231 Lead Agency: City of Bloomfield Est. Letting: Proj Vereda del Rio San Juan River Trail Phase III Fr: End of Phase II To: .495 Miles East Project Desc.: Construct River Trail Est. Proj. Cost: $203,050 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: City of Bloomfield RT1 Length: 0 Category: Bike/Ped Remarks: Added and split this project (Phase II & III) via TAP funds as part of Amendment #3 to the FFY 2014-2019 TIP (approved Nov 14,2013). PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100231 Construction â–  Right-of-way â–¡ Prel. Engr. â–¡ FUND SOURCE 2016 2017 2018 2019 2020 2021 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design â–¡ Environ. Document â–¡ Other â–¡ TIP Informational Years TIP Amendment Pending?â–¡ Routine Work Zone: RT2 Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 BMP: 0 TAP-Sm Urb $158,580 $158,580 $203,050 $203,050 Totals $0 $0 State Match $27,024 $27,024 Local Match $17,446 $17,446 Local Non-Match 28 28 Farmington MPOs FFY2016-2021 Transportation Improvement Program (Approved June 30, 2015) 12 of 15 ---PAGE BREAK--- Farmington MPO Rec Num: 85 CN: F100270 Lead Agency: San Juan County Est. Letting: Proj New Project Kirtland Schools Walk Path System Fr: New Project US 64 and CR 6575 To: New Project Kirtland Elementary on CR 6446 Project Desc.: New Project Asphalt walk path and sidewalks with curb and gutter Est. Proj. Cost: $1,000,000 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: Unincorporated San Juan Co RT1 456100 Length: 2.84 Category: Bike/Ped Remarks: New projected add to the FFY 16-21 TIP in June 2015. PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: F100270 Construction â–¡ Right-of-way â–¡ Prel. Engr. â–  FUND SOURCE 2016 2017 2018 2019 2020 2021 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design â–¡ Environ. Document â–¡ Other â–¡ TIP Informational Years TIP Amendment Pending?â–  Routine Work Zone: RT2 456400 Rt 1 BMP 4.9 Rt 2 BMP: 0 Rt 1 EMP: 5.67 Rt 2 BMP: 0.61 TAP-Sm Urb $102,527 $102,527 TAP-Sm Urb $751,873 $751,873 $1,000,000 $119,999 $880,001 Totals $0 State Match $145,600 $17,472 $128,128 Local Match 15 28 15 28 Farmington MPOs FFY2016-2021 Transportation Improvement Program (Approved June 30, 2015) 13 of 15 ---PAGE BREAK--- Farmington MPO Rec Num: 201 CN: TF00001 Lead Agency: City of Farmington Est. Letting: Proj New Project Red Apple Transit Capital/Operating Fr: New Project N/A To: New Project N/A Project Desc.: New Project Annual operating costs and capital purchases for bus and security cameras Est. Proj. Cost: $1,289,587 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: City of Farmington RT1 Length: 0 Category: Transit Remarks: New projected add to the FFY 16-21 TIP in June 2015. PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: TF00001 Construction â–¡ Right-of-way â–¡ Prel. Engr. â–¡ FUND SOURCE 2016 2017 2018 2019 2020 2021 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design â–¡ Environ. Document â–¡ Other â–  TIP Informational Years TIP Amendment Pending?â–  Exempt Work Zone: RT2 Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 BMP: 0 FTA 5307 (Sm Urb Oper) $500,000 $500,000 $2,000,000 FTA 5311 Capital $22,400 $22,400 FTA 5339 (MAP-21 Bus/Facil ) $65,600 $65,600 $4,110,000 $1,110,000 $1,000,000 Totals State Match $2,022,000 $522,000 $500,000 Local Match 23 23 23 23 23 23 $500,000 $1,000,000 $500,000 $500,000 $1,000,000 $500,000 Farmington MPOs FFY2016-2021 Transportation Improvement Program (Approved June 30, 2015) 14 of 15 ---PAGE BREAK--- Farmington MPO Rec Num: 202 CN: TF00010 Lead Agency: City of Farmington Est. Letting: Proj New Project Red Apple Transit Bus Route Accessibility Fr: To: Project Desc.: New Project Bus shelters, bus pull outs, ADA ramps at multiple locations Est. Proj. Cost: $81,577 Project Phases: NMDOT Dist.: 5 County: San Juan Municipality: City of Farmington RT1 Length: 0 Category: Transit Remarks: New projected add to the FFY 16-21 TIP in June 2015. PROGRAMMED FUNDS - Four Year Federal TIP by Funding Category Fed ID: TF00010 Construction â–  Right-of-way â–¡ Prel. Engr. â–¡ FUND SOURCE 2016 2017 2018 2019 2020 2021 4 Yr. TOTALS Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) Miles Design â–  Environ. Document â–¡ Other â–  TIP Informational Years TIP Amendment Pending?â–  Routine Work Zone: RT2 Rt 1 BMP 0 Rt 2 BMP: 0 Rt 1 EMP: 0 Rt 2 BMP: 0 TAP-Sm Urb $3,400 $66,300 $81,577 $3,979 $77,598 Totals State Match $579 $11,298 Local Match 15 15 $69,700 $11,877 Farmington MPOs FFY2016-2021 Transportation Improvement Program (Approved June 30, 2015) 15 of 15